QFS scaffolding services

Façade and recladding access

Façade and building-safety projects require access that can respond to changing findings, multiple elevations and a tightly controlled sequence of work. QFS plans and manages scaffolding around the building, the remediation design and the practical requirements of the façade team.

Planned properly. Managed carefully. Delivered safely.

What the service can include.

  • Full-height external access
  • Access for façade investigation
  • Cladding removal and replacement access
  • High-rise remediation scaffolding
  • Adaptations around changing work fronts
  • Public and resident protection measures

Planning and coordination

The scaffold is part of the programme.

The final access requirement is not always known when a remediation project starts. Opening-up works can reveal structural or façade conditions that require the scaffold arrangement to change. QFS maintains close coordination with the main contractor, façade contractor and design team so alterations can be planned safely.

Restricted sites, occupied neighbouring buildings and different tower heights can introduce additional logistical and protection requirements. These constraints are considered alongside scaffold loads, delivery planning and the sequencing of removal and replacement works.

Controlled delivery

From early review to dismantling.

  1. Review elevations and remediation scope
  2. Coordinate scaffold design and load paths
  3. Plan deliveries and restricted-site logistics
  4. Establish phased access
  5. Respond to investigation findings
  6. Adapt and dismantle with the façade programme

Relevant environments

Capability applied where it matters.

  • Building-safety remediation
  • High-rise residential
  • Occupied buildings
  • External refurbishment
  • Complex façades
  • Mixed-use developments

Relevant QFS projects

Evidence from live construction environments.

Specialist access scaffolding installed around the towers at 52–58 Commercial Road

High-rise façade remediation

52–58 Commercial Road

A highly engineered scaffolding and specialist access package supporting building-safety remediation across two residential towers.

External access scaffolding installed around Nova House in Slough

Façade refurbishment

Nova House, Slough

Scaffolding and specialist access for the major external refurbishment of a 68-apartment high-rise residential building.

The new St Andrew the Apostle School in North London

New-build education

St Andrew the Apostle School

A comprehensive access package supporting the construction of new teaching and sports facilities.

Worthing Integrated Care Centre on Stoke Abbott Road

Healthcare construction

Worthing Integrated Care Centre

Full external and internal access supporting the delivery of a major new integrated healthcare facility.

The Garratt Mills development in Earlsfield

Residential development

Garratt Mills, Earlsfield

External and internal access for a major residential scheme beside a live rail environment.

The completed Springfield University Hospital redevelopment

Healthcare redevelopment

Springfield University Hospital

External, atrium and hoist access supporting a complex construction project.

Barlby New Schools under construction in North Kensington

New-build education

Barlby New Schools

Access and protection during the construction of new primary and specialist education facilities.

UCL East Marshgate at Queen Elizabeth Olympic Park

Specialist university access

UCL East – Marshgate

Suspended, atrium and façade access for UCL’s landmark interdisciplinary campus building.

The Marshall Building at the London School of Economics

Logistically complex education

The Marshall Building, LSE

Hoist, atrium and external access on a technically and logistically demanding central London project.

The K1 Knightsbridge development during construction

Restricted city-centre access

K1 Knightsbridge – Basil Street

Public protection, lifting and multi-level access on a highly constrained mixed-use development.

The completed 80 Fenchurch Street development

Commercial construction

80 Fenchurch Street

A comprehensive access, lifting and protection package on a major City office development.

The completed 60 London Wall commercial development

Major commercial refurbishment

60 London Wall

Atrium, façade and protection scaffolding during a major structural refurbishment in the City.

The completed Hambrook House development in Brixton

Mixed-use residential

Hambrook House, Brixton

External, hoist and lift-shaft access on a new mixed-use residential development.

Start a conversation

Planning a façade and recladding access package?

Share the available drawings, programme and access requirements with our estimating team so the package can be reviewed properly.