QFS scaffolding services

Complex scaffold design

Complex scaffold packages depend on a clear understanding of the existing structure, proposed load paths, construction sequence and interfaces with temporary and permanent works. QFS brings estimating, engineering and operational input together before erection begins.

Planned properly. Managed carefully. Delivered safely.

What the service can include.

  • Bespoke scaffold arrangements
  • Gallows and supported scaffolds
  • Bridging gantries
  • Protection and containment scaffolds
  • Design coordination with existing structures
  • Engineering input during tender

Planning and coordination

The scaffold is part of the programme.

Early technical review allows the access concept to be tested against the realities of the structure and programme. This helps establish where loads can be transferred, where clear spans are required and how the scaffold will change as construction or demolition progresses.

The design cannot be separated from delivery. QFS coordinates engineering decisions with erection methodology, material movements, inspection requirements and the needs of the people who will use the scaffold throughout the project.

Controlled delivery

From early review to dismantling.

  1. Define the access and protection requirement
  2. Review structural information and constraints
  3. Develop the scaffold concept
  4. Coordinate design interfaces
  5. Plan erection and alteration sequences
  6. Maintain design control through delivery

Relevant environments

Capability applied where it matters.

  • High-rise remediation
  • Controlled demolition
  • Constrained urban sites
  • Major refurbishment
  • Heritage structures
  • Façade remediation

Relevant QFS projects

Evidence from live construction environments.

Specialist access scaffolding installed around the towers at 52–58 Commercial Road

High-rise façade remediation

52–58 Commercial Road

A highly engineered scaffolding and specialist access package supporting building-safety remediation across two residential towers.

Extensive scaffolding installed around Clare House in Bow

Complex demolition scaffold

Clare House, Bow

A specialist scaffolding and access package supporting the controlled demolition of a 22-storey residential tower.

Historic 2004 view of Battersea Power Station before its redevelopment

Major construction project

Battersea Power Station – Phase 2

A major scaffolding and specialist access package supporting Phase 2 of the transformation of the Grade II* listed Battersea Power Station.

Worthing Integrated Care Centre on Stoke Abbott Road

Healthcare construction

Worthing Integrated Care Centre

Full external and internal access supporting the delivery of a major new integrated healthcare facility.

The Garratt Mills development in Earlsfield

Residential development

Garratt Mills, Earlsfield

External and internal access for a major residential scheme beside a live rail environment.

The completed Ropemaker development in the City of London

Complex commercial access

Ropemaker Street

Gantry, lifting and public-access solutions for a major City of London commercial development.

The completed Springfield University Hospital redevelopment

Healthcare redevelopment

Springfield University Hospital

External, atrium and hoist access supporting a complex construction project.

UCL East Marshgate at Queen Elizabeth Olympic Park

Specialist university access

UCL East – Marshgate

Suspended, atrium and façade access for UCL’s landmark interdisciplinary campus building.

The Marshall Building at the London School of Economics

Logistically complex education

The Marshall Building, LSE

Hoist, atrium and external access on a technically and logistically demanding central London project.

The K1 Knightsbridge development during construction

Restricted city-centre access

K1 Knightsbridge – Basil Street

Public protection, lifting and multi-level access on a highly constrained mixed-use development.

The completed 80 Fenchurch Street development

Commercial construction

80 Fenchurch Street

A comprehensive access, lifting and protection package on a major City office development.

The completed 60 London Wall commercial development

Major commercial refurbishment

60 London Wall

Atrium, façade and protection scaffolding during a major structural refurbishment in the City.

The completed 100 Liverpool Street development at Broadgate

Transport-interface construction

100 Liverpool Street

Stair, atrium and edge-protection access above one of London’s busiest stations.

Tilbury Power Station before demolition

Industrial demolition access

Tilbury Power Station

Specialist demolition access supporting the controlled dismantling of a major industrial site.

Start a conversation

Planning a complex scaffold design package?

Share the available drawings, programme and access requirements with our estimating team so the package can be reviewed properly.