Complex demolition scaffold

Clare House, Bow

Bow, East London

Extensive scaffolding installed around Clare House in Bow

QFS was appointed to provide the specialist scaffolding and access package for the controlled demolition of Clare House, a 22-storey residential tower in Bow, East London.

Our works include a fully encapsulated demolition scaffold, flame-retardant protective sheeting, a HAKI access staircase and a bridging gantry for demolition plant. The scaffold is progressively dismantled alongside the top-down demolition, remaining above the active working level to provide continuous protection and contain dust and debris.

The project is being delivered within a restricted residential location, with neighbouring properties remaining occupied. This requires detailed planning and close daily coordination between QFS and the client’s demolition team.

Clare House demonstrates QFS’s ability to deliver complex, safety-critical demolition scaffolding that adapts precisely to the demolition sequence while protecting operatives, neighbouring residents and the surrounding environment.

Start a conversation

Planning a complex scaffolding package?

Bring QFS into the conversation at tender stage to develop a practical, competitive access solution.