QFS provided the temporary access and protection needed to support refurbishment works at Capstan House on the Isle of Dogs.
Hoist-backing scaffolds connected the lifting operation securely into the working floors, while loading bays provided controlled points for distributing materials. Edge protection and guardrails were installed as the work areas developed to maintain safe boundaries around exposed levels.
The package was planned around the building’s logistics and adapted with the construction sequence, helping maintain safe and efficient movement throughout the project.

